Author:
Jonathan Rogers

Back to news

New Ferrari Service Centre

Jubb were appointed to provide Civil and Structural design services on this state-of-the-art facility for Meridien Modena.

The fast-track programme required the steelwork design to be provided in extra quick time to allow the fabrication process to be accelerated.  Utilising our SCIA software and REVIT allowed BIM models to be shared with the fabricator to quicken the process.